Competition
Leaderboards#
- One board per route × rule set × run type (pro, practice, stage). Styles get their own boards too.
- Each entry: player, time, date, the splits, and the replay. Every entry can be watched and raced.
- Verified: the server re-simulates the replay before the time counts (tech/replay.md). No replay, no record.
- Map versions: a board belongs to one exact map version (hash). When the author changes the map, the old board is archived unless the collision did not change.
- Imported UrT times (UJM): shown apart, marked as "UrT server", because they come from demos and not from verified replays.
Medals#
Per route:
| Medal | Time |
|---|---|
| Finished | no time limit: you finished the route once (practice runs with loads count). The first goal of every player |
| Bronze / silver / gold | set by the author, or derived from the board (e.g. top 50 % / 25 % / 5 %) |
| Author | the map author's own time (proves the route can be finished) |
Medals give every player a next goal, not only the top 10.
Ranks and points#
- Points per record, weighted by map tier (difficulty) and place.
- A global rank, a rank per rule set, and a monthly rank.
- Tiers: difficulty 1–6 in the map metadata, set by the author and adjusted by votes from players who finished.
Events#
- Races: live events on a server: everyone starts together, one attempt, drop out and you're out. Single races, knockouts, cups (multiplayer.md).
- Map of the day / week: one map for everyone, with its own board for the period.
- Cups: a live time window (e.g. 30 minutes), unlimited attempts, best time counts, then a final round. Spectate the leaders live.
- Seasons: a campaign of maps for three months, with medals and a season rank.
- Community tournaments: organisers make a room with a map list and rules, and the server keeps the times.
Fairness#
- One rule set per board. Practice tools (rewind, slow motion, the gravity key, …) mark the run as practice, and practice runs never count on the main boards.
- Replays can be checked: the server re-simulates them, and humans can watch any record.
- Suspicious runs: impossible input patterns (perfect sync for minutes, inhuman turning) can be flagged for review. Tool-assisted runs (TAS) get their own category, never mixed with normal runs.
- Same physics everywhere: every platform gives bit-identical results, so a time is the same on every machine.